Due to the adjustment of the power supply product line, the large-size CP1207-5A will be discontinued from July 2021, and the small-size CP1207-5A will continue
The FCL(Full Container Load) by sea need to send the purchasing order to us on or before 8th.Jan.2021.
The LCL(Less than Container Load) by sea need to send